Exterior painting
Frames, windows, doors, fascias and the dormer. Outside, paint takes everything the weather throws at it, so preparation counts most.

A frame that looks shabby again after two years is almost never badly painted. It was badly prepared. So first we sand until the paint is sound, rout out wood rot and reseal the joints.
On bare wood we apply the full system: primer, undercoat and topcoat. On wood that is still sound, we sand it down and only add a new topcoat. That way you don't pay for coats you don't need.
What's included
- Wood rot repaired with two-part filler
- Primer, undercoat and topcoat on bare wood
- Glazing and sealant checked
- 5-year guarantee under the OnderhoudNL terms
The layers on bare wood
- WoodBare and dry: moisture content below 18%.
- PrimerSalmon pink. Soaks into the grain so everything grips.
- UndercoatFills and levels. Then lightly sanded.
- TopcoatColour, gloss and protection from sun and rain.
A terraced house in nine working days
- Day 1Scaffold up, garden and windows covered
- Day 2 – 4Sanding, wood rot repair, sealing
- Day 5 – 6Primer and undercoat
- Day 7 – 8Topcoat, opening parts first
- Day 9Joint inspection, scaffold down
Guide prices
So you won't face any surprises. After the survey we work out every item to the euro.
| Terraced house, frames front and back | € 3.400 – € 5.200 |
|---|---|
| End-terrace or semi-detached house | € 5.200 – € 8.400 |
| Detached house | from €8,900 |
| Wood rot repair | from €95 per spot |
| Scaffold for a terraced house | from €650 |
Guide prices incl. VAT. Is your home more than two years old? Then labour falls under the low 9% rate. The survey turns it into a fixed price.
From practice · Spring 2026
1930s house on the Lindelaan
Exterior in the original colours, with wood rot repair in the bottom sills.
- Client
- Homeowner
- Location
- Lindelaan, Voorbeeldstad-Zuid
- Period
- Spring 2026
- Duration
- Nine working days
How long does exterior paintwork last?
Six to eight years on wood, if you have small damage touched up after three years. That's why we come and look after three years.
Do I need to stay home while you paint?
Only on the days we lacquer windows and doors. They have to stay open to dry. We agree that day by day.
And when it rains?
Then we sand and seal under the scaffold, or work indoors. The tins stay shut until it dries up.
Exterior painting: plan your survey.
The site manager visits free of charge, probes the wood and sends a quote per item within seven days.