VvE Wilgenhof, 48 flats

Deck-access block, outside and inside in seven weeks, with a new MJOP.

Summer 2025

VvE Wilgenhof

Four-storey deck-access block in scaffolding, walkways neatly covered, a painter lacquering a balcony railing

What the client wanted

The board wanted to tackle the overdue maintenance in one go, without residents being bothered for months.

What we found

The walkway railings were rusting at the welds and the sealant around the fronts was loose in many places. We dealt with that first.

How it looks now

After seven weeks the last facade was done, finished one by one. The board now has a plan up to 2035 and knows what to set aside each year.

How the schedule went

  1. Week 1Residents' letter, front facade scaffold
  2. Week 2 – 3Front facade, walkways and railings
  3. Week 4 – 5Rear facade and balconies
  4. Week 6Stairwells and entrances
  5. Week 7Handover with the board and the managing agent