
Projects
Work in and around Voorbeeldstad. For each project: what the residents wanted, how we built it and the bill.
Every project comes with an address where we're still welcome.Jacco
Dormer in Voorbeeldstad-Noord
Extensions and dormers · 2026
New 3-metre dormer on a 1930s house. Weathertight in one day, completely finished after three.
- Where
- Voorbeeldstad-Noord
- Build time
- 3 working days
- Investment
- € 10.640
By five o'clock it was closed. Dry, and the children slept upstairs.Jacco
This is how we built itMade-to-measure oak staircase
Floors and stairs · 2026
Open staircase in solid oak with a closed landing, finished with hardwax oil.
- Where
- Voorbeeldstad-Centrum
- Build time
- 5 working days
- Investment
- € 8.400
Cees sanded every tread by hand.Jacco
This is how we built itGarden room with sliding doors
Extensions and dormers · 2025
Timber extension with glass sliding doors and a roof light, behind a terraced house.
- Where
- Voorbeeldstad-Oost
- Build time
- 4 weeks
- Investment
- € 46.500
The roof light made the difference. For the old room too.Jacco
This is how we built itOther work from 2025 and 2026
Not everything gets its own page.
| Year | Where | What |
|---|---|---|
| 2026 | Voorbeeldstad-Zuid | Six hardwood window frames with triple glazing, terraced house from 1932 |
| 2026 | Voorbeeldstad-West | Full-width built-in cupboard under the sloping roof |
| 2026 | Voorbeeldstad-Centrum | 52 m² herringbone floor in oak, oiled |
| 2025 | Voorbeeldstad-Noord | Front door with side light and SKG** fittings |
| 2025 | Countryside | Douglas fir barn with carport for two cars |
| 2025 | Voorbeeldstad-Oost | Closed staircase clad in oak, 14 steps |